Located in Nottinghamshire, E.On’s Ratcliffe-on-Soar facility is one of the most efficient coal fired power stations in the UK.
A replacement sewage treatment solution was required to serve personnel located at the site’s Technology Centre and Main Power Station.
The Power Station does not have the benefit of mains drainage to a Water Company sewage treatment works and therefore all waste water generated on site requires treatment before being discharged to the adjacent watercourse.
An existing “on site” sewage treatment plant was being considered for replacement due to the age of the assets but also the need to accommodate higher projected numbers of personnel for decades to come.
Several treatment options were proposed before E.On chose an “above ground” solution. Criteria which steered the company Engineers with their decision making was simplicity of design of an above ground installation and ease of plant operation.
The automated plant design incorporated:
The plant is designed to achieve stringent Environment Agency consent standards for Biochemical Oxygen Demand, Suspended Solids and Ammonia.
With nutrient neutrality requirements being enforced at off-mains properties in areas of England, homeowners need to ...
Why managing variable loads matters If you have an off mains wastewater treatment system operating at a hospitality, ...
Trade effluents are liquid waste streams discharged into public sewers from businesses and industrial processes. Their ...
Connect with WCS Environmental Engineering Safe Efficient Compliance
WCS Group is a trading name for WCS Environmental Ltd, registered in England and Wales (Number 02184649) at 20 Grosvenor Place, London, SW1X 7HN. Head Office – 17 Wheatstone Court, Waterwells Business Park, Gloucester, GL2 2AQ. WCS Group is a Marlowe Critical Services Company owned by Marlowe plc. 2025© WCS Environmental Ltd.